Steps 1 Start “dust removal†to confirm that the dust collector is working properly (steering) 2 Start “screening†to confirm that the screener is working properly (steering) 3 Start “Whole Grain†to confirm that the granulator is working properly (steering) 4 Start “Pressing†to confirm that the tablet roll is working normally (steering) 5 Start “Feeding†to confirm that the feeding mechanism is working normally (steering) 6 Press “Hydraulic†to open, start hydraulic station (confirm steering) set pressure, please refer to “Operation and Maintenance Proceduresâ€. After setting, relieve pressure. 7 or more start-up items are gradually opened and idle for about 5 minutes. After confirming that there is no abnormality, press The normal starting step, on the contrary, gradually stops the operation of the mechanism and is familiar with the operation process. A brief overview: The machine is a new granule new equipment which uses the crystallization water in the powder (water content is 0.5~5%) to directly degas, retract and granulate the powder. The model has reasonable structure, stable and reliable performance, convenient cleaning and maintenance, high power, high output and good particle flowability. The granules made by this machine can be pressed into tablets, used as granules, tube capsules, etc. The machine is mainly used for granulation in pharmaceutical, food, chemical and other industries. It is especially suitable for granulation of wet and unsolvable materials. The machine can be used in combination with a spray dryer, a mixer, and the like. model GK-120 GK-100 GK-80 GK-60 GK-25 Flaky yield ( kg/h ) 150~250 120~200 80~150 20~100 3~10 Granular yield ( kg/h ) 75~100 30~70 20~50 5~40 0.5~3 Particle fineness ( mm ) 0.5~4 0.5~4 0.5~4 0.5~2.5 0.5~2 Zui big pressure ( kn ) 294 294 294 160 100 Side seal pressure ( kn ) 9.8 9.8 9.8 Hand tone Hand tone Feed motor ( kw ) 2.2 2.2 1.5 1.55 0.37 Pelletizing motor ( kw ) 7.5 7.5 5.5 3 1.5 Feed screw speed 6~60 6~33 6~33 6~33 6~33 Pressure roller speed 4~25 4~25 4~25 4~25 4~25 Pressure roller dimensions ( mm ) 240×120 240×100 240×80 150×60 120×25 Dimensions (mm) 1880×1020×2300 1600×1000×2300 1600×1000×2300 1085×650×1600 880×550×1300 Weight (about kg ) 2000 2000 1800 950 750 1. The machine consists of lifting, feeding, tableting, granulating, hydraulic, cooling, rack, outer seal and electrical components. (1) The lifting part is realized by the hydraulic lifting cylinder to raise and lower the feeding mechanism, and the position switch is used to control the position, and interlocked with feeding, pressing and granulating. (2) The feeding part is driven by the Y100L1-4 motor to drive the screw with different pitch of the double cone to pre-press and degas the powder. According to the performance of different materials, the feeding speed can be adjusted steplessly (frequency control). (3) The tablet is driven by the Y132M-4 motor to drive the BW27-29-7.5 cycloidal pinwheel reducer to rotate the drive shaft, which drives the relative rotation of the two pressure rollers to work together with the pressure to compress the powder into a sheet. According to the compressibility of different materials, the pressure roller can be adjusted steplessly (frequency control) (5) The pressure part is supplied by the electric vane pump to the oil cylinder, and is regulated by the energy storage device. The upper and lower pressure limits are set by the electric contact pressure gauge. ( 6 ) Cooling can be done by tap water or cooling water, through the HS-X32A two-way inner tube rotary joint, through the shaft hole to force the surface of the pressure wheel. 2. Production It is mainly determined by the fluidity, compressibility, viscosity, humidity and fineness of the finished particles of various particles. Different materials have different yields. Appropriate measures can be taken to increase production. 4. Use maintenance and maintenance 1. After unpacking, check the certificate, the instruction manual, the packing list, whether the information is complete, and whether the spare parts are complete. 2. Check whether the parts are damaged during the transportation process and whether the fasteners are loose. 3. Switch on the water source, check whether the water quality and the inflow and outflow are unblocked, and whether the cooling system leaks. 4. Empty operation: (1) Turn on the power and ground, turn on the air box air switch and the inverter air switch. (2) Start the oil pump motor, pressurize the cylinder pressure test, adjust the overflow valve to 6Mpa, adjust the electric contact pressure gauge to 4~5Mpa, then check the pressure to check whether the hydraulic system is normal, whether the pressure gauge is sensitive, and whether the hydraulic system joint is leaking. oil. (3) Unscrew the funnel seat bolts (6 M10 bolts) for the lifting test to check whether the fiber switch position is reliable and recover. Note: When using the lift cylinder, the inverter air switch must be turned off due to electrical interlocking. The electric cabinet rotation switch is turned to manual and the electric door lock is opened to use the lifting cylinder. Warning: When using the opening and lowering function, remember to first remove the funnel seat (6 M10 bolts). 5. Granulation test: Prepare the powder, control the indoor temperature, humidity <65, install the screen according to the requirements of the finished product, connect the water and electricity, start the oil pump motor, the rain pressure, start the whole grain, press the film, feed the motor, after 10 minutes of normal operation, Gradually add materials to the funnel, adjust the oil pressure and the speed of the tablet and feed motor in time, so that the three elements can reach the reasonable combination state. 6. If the oil pressure is difficult to rise or the pressure drops too fast, check the oil pump motor and the deceleration valve check valve; if the pressure relief fails, check the solenoid valve; if the voltage is not good, check the energy storage device. 7. Lifting faults should check whether the throttle valve is adjusted, blocked, and related to oil leakage. The pressure is too low. Remember that the throttle valve is not adjustable too fast, and the rising speed must be slow when lifting. 8. If the material is blocked, after the total stop, re-connect the power, relieve the pressure, reverse the pressure wheel, or raise the funnel, take out the blocking material, let go of the funnel material, and after re-installation, reduce the feeding speed and speed up the tableting. The speed is, after normal operation, continuous production. 9. If the feeding is difficult, check if the V-belt is tight; whether the feeding screw and the funnel are stuck; whether the material is too light; or the material humidity is too small or too large. 10. The yield is low, whether the tablet is too loose; whether the whole grain speed is too fast, whether it breaks the net. 11. The equipment department and production department should be familiar with the production process specifications, familiar with the performance, maintenance and maintenance knowledge of the equipment, so that the equipment is in good working condition. 12. Do not mix hard metal in the material, otherwise damage the feeding screw, the surface of the blade pressure wheel and the screen. 13. Strict operation specifications, no overload operation, timely troubleshooting, timely replacement of damaged parts, material on the surface of the pressure roller, can not be removed and beaten with hard tools. Otherwise the surface of the pressure roller is damaged. The gap between the squeegee and the pressure roller surface is 0.1 mm. 14. The work is over, cleaned and cleaned in time, and timely maintenance. 15. Change the oil or grease (hydraulic oil, gear oil) every 6 months, and always check whether the parts are damaged and repair or replace them in time. Wu, wearing parts (users can go directly to our mail order) 1. Side seal F4 version 2 pieces 2.O-ring 18×5.7mm 4 pieces 115±3mm 4 pieces The hydraulic pump station consists of a pump unit and a hydraulic manifold. It has the advantages of compact structure, convenient use and maintenance, etc. It only needs to be connected with the oil pipe to make the actuator work. (Attached) 3. Use and maintenance: 1. YZ hydraulic station uses hydraulic oil with a kinematic viscosity of 17~23%. The degree of oil contamination is within the NAS standard level 12 (particle counting method) or 108 level (gravimetric method). 2. Hydraulic oil zui high working temperature is 50 ° ± 5 °. 3. The oil storage capacity of the fuel tank should be kept at the low level of the liquid level indicator. The oil tank should be cleaned before being filled with oil, and no fibers or other impurities are allowed to remain. 4. Hydraulic station Zui high working pressure 8Mpa Before starting the oil pump, the pressure regulating circuit relief valve should be loosened to the high pressure of Zui, and then adjust the relief valve to achieve the required working pressure. 5. Pay attention to the motor power supply, voltage and control voltage should be consistent with the regulations. 6. Clean the fuel tank and oil filter regularly and change the hydraulic oil according to the usage. 7. If there is no pressure, first check if the motor is reversed, then check if the relief valve is stuck. If it is stuck, remove the parts and clean it and reload it. Protein series Xi'an complex bio-tech CO.,LTD. , https://www.complexpowder.com
Jiangyin Kang and GK dry granulator operation and maintenance procedures (2)>